North County San Diego Free estimates available

ADU Construction

ADUs are one of the smartest investments San Diego homeowners can make — adding rental income, housing for family members, or future resale value. We guide you through California's ADU regulations, help evaluate your property's potential, and coordinate the construction process from permits to final inspection.

  • Garage conversions, detached units, and junior ADUs
  • California ADU regulation expertise
  • Site feasibility and setback analysis
  • Permit coordination with local jurisdictions
Get your estimate
Tell us your scope

Text is fine — we'll use this to confirm details and scheduling.

Fast follow-up. Photos help us price faster.

Overview

What we do on a adu construction visit

We confirm scope, protect the work area, complete the job cleanly, and review results with you so there are no surprises.

  • Garage conversions, detached units, and junior ADUs
  • California ADU regulation expertise
  • Site feasibility and setback analysis
  • Permit coordination with local jurisdictions
Fastest way to a clean estimate
  • 2–4 photos (wide + close-up)
  • Rough dimensions
  • Your timing window
  • Access / parking notes
Prefer to call?
(760) 283-6748
Typical projects

Common requests we handle

These are the kinds of scopes we can quote quickly.

Detached 600 sq ft backyard ADU
Two-car garage conversion
Junior ADU within existing home
Pricing

Pricing & scheduling

We quote based on scope, access, materials, and time. Photos + basic dimensions help us tighten pricing faster.

  • Written scope before scheduling
  • Clear next steps after review
  • Tidy completion and walkthrough
When we refer out

If a job needs permits, engineering, or a specialist scope outside our lane, we'll tell you upfront and point you to the right resource.

Request an estimate
1) Request
Tell us your scope and timing.
2) Confirm
We confirm details and next steps.
3) Complete
Clean finish + walkthrough.
Where we serve

Where we offer ADU Construction

Pick your city to view the dedicated service page.

Reviews

What customers say

A few recent notes from clients across our service area.

"Quick, professional, and easy to schedule. Great results and a clean finish."
Sarah M.
Carlsbad
"They showed up on time, explained everything clearly, and left the work area spotless."
David T.
Carlsbad
"Handled our punch list efficiently. Fair pricing and no surprises."
Jennifer R.
Carlsbad
FAQ

Questions about adu construction

Quick answers before you request an estimate.

Do you offer ADU Construction?

Yes — we offer adu construction across North County San Diego. Share your scope and city for a clear estimate.

Do you offer free estimates?

Yes. Share a short description (and photos if you can) and we'll follow up with next steps and a clear estimate.

How much does it cost to build an ADU in San Diego?

ADU costs in North County San Diego typically range from $150,000-$350,000+ depending on size and type. Garage conversions average $100,000-$180,000. Detached new construction runs $200,000-$400,000 for 400-1,200 sq ft units. Junior ADUs (under 500 sq ft within existing space) can be $80,000-$150,000.

What are California's ADU rules in 2024-2025?

California law allows ADUs up to 1,200 sq ft on most single-family lots, with reduced setbacks (4 ft side/rear), no parking requirements near transit, and streamlined permitting (60-day approval timeline). San Diego County and cities have additional local rules. We stay current on regulations to maximize your options.

Can I convert my garage to an ADU?

Garage conversions are one of the most cost-effective ADU options. California law protects garage conversions from parking replacement requirements in most cases. Key considerations include ceiling height (must reach 7'6"), foundation adequacy, and utility access. We assess feasibility during our initial consultation.

How long does ADU construction take?

Plan for 8-14 months total: 2-4 months for design and permits, 4-8 months for construction. Garage conversions are faster (4-6 months construction). Detached new construction takes longer (6-10 months). Permit timelines vary by jurisdiction — Carlsbad and Encinitas typically process faster than unincorporated areas.

What's the ROI on building an ADU in San Diego?

ADUs in North County San Diego typically rent for $1,800-$3,500/month depending on size and location. A $200,000 ADU renting for $2,500/month generates $30,000/year in gross income. Many homeowners see 12-18% annual returns. ADUs also add 20-30% to property resale value.

Do I need a separate address and utilities for my ADU?

ADUs can share utilities with the main house or have separate connections — we recommend separate metering for rentals. San Diego County requires a separate address for ADUs with independent entrances. We coordinate utility planning during the design phase.

Get a clear estimate — schedule when you're ready

Send a short description (and photos if you can). We'll confirm scope, timing, and next steps.

Fast path
  • 2–4 photos (wide + close-up)
  • Rough dimensions
  • Your timing window
  • Access / parking notes
Call / Text Get estimate